In the presence of the Belgian defence minister, Mr André Flauhaut, the first LEGUAN Leopard 1 bridge layer was handed over to the Belgian army on 24th September 2001. The handing-over ceremony took place at the Ecole de Génie in Jambes.
The overall scope of the order comprises 9 bridge layers and a total of 16 LEGUAN bridges, for military load class MLC 70, with a length of 26 m.